Strip · Dry · Sand · Stain

Deck staining that survives a Lowcountry summer.

Damp wood won't hold stain. We strip the old finish, let the boards dry to a moisture reading, sand the raised grain — then stain. Transparent, semi-transparent, or solid.

The honest version

Deck Staining — done right the first time.

A deck in the Lowcountry gets it from three directions at once. Overhead sun that bleaches the south-facing boards while the shaded end still looks new. Humidity that keeps wood damp for days after an afternoon storm. And mildew that doesn't sit on top of the finish — it grows into the grain underneath it.

Which is why the most common way a deck job fails here has nothing to do with the stain. It's staining wood that was still wet. Stain has to soak into the fiber; if water is already in there, the stain sits on the surface, and what sits on the surface peels. So we strip the old finish and kill the mildew, then we wait — usually 48 hours or more after the wash, longer if the week has been wet — and we confirm with a moisture meter instead of a calendar. Then we sand the grain the water raised, because a stripped deck always comes back rough.

After that, the choice is how much wood you want to see. Transparent shows the most grain and the least protection, and needs redoing soonest. Semi-transparent is the middle — enough pigment to block UV, still reads as wood — and it's what we spec on most pressure-treated pine and cedar decks here. Solid covers the grain like paint, holds its color longest, and is close to permanent: once a deck is solid, going back to transparent means stripping and sanding to bare wood again. We bring sample boards so you pick that in daylight, on your deck, before anything is ordered.

What's included

Every job ships with these basics.

  • Old stain and mildew stripped, never coated over
  • Moisture-meter reading before any stain goes down
  • Hand-sanding of raised grain, rough boards, and splinters
  • Popped nails and screws reset before sanding
  • Railings, balusters, stair treads, and stringers cut in by hand
  • Transparent, semi-transparent, or solid — sample boards on your deck first
  • Siding, plantings, and hardscape masked and rinsed
  • Lifetime workmanship warranty in writing
Why Reginaldo

What makes us different.

We wait for the wood to dry.

This is the whole job. A deck that gets stained damp will peel inside a season no matter what's in the can. We wash, then we wait — 48 hours minimum, longer after a wet week — and we take a moisture reading before the first board gets stained. If it isn't dry, we come back.

Back-brushed into the grain.

Deck stain has to be worked into the wood, not laid on top of it. We brush and back-brush every board, cut railings and balusters by hand, and we don't over-apply — stain that can't soak in is stain that will peel off in sheets next August.

The right stain for the boards you have.

Old pressure-treated pine, new cedar, and tropical hardwood all take stain differently, and a full-sun deck is a different problem than a covered porch. We match the product to the wood and the exposure, and we show you real sample boards on your own deck before you decide.

How we work

Five steps,
zero surprises.

  1. 01

    Free walk-through

    Reginaldo checks board condition, exposure, and what's on there now — some old finishes strip easily, some fight back. Loose boards, popped fasteners, and any rot get flagged in writing before we quote.

  2. 02

    Strip and kill the mildew

    The old finish and the gray weathered layer come off with strip-grade pressure and the right stripper for what's on the wood. Mildew gets a detergent that kills it in the grain, not a rinse that just lightens it.

  3. 03

    Dry down + moisture check

    The deck sits and dries — 48 hours minimum, longer if the forecast has been wet. Then a moisture meter tells us whether it's ready. This is the step every failed deck job skipped.

  4. 04

    Sand + stain

    We sand the grain the water raised, vacuum the dust, then brush and back-brush the stain to the manufacturer's spec — some products are one coat, some take a wet-on-wet second pass. Railings and stairs are cut in by hand.

  5. 05

    Cure + walk-through

    Stay off it about 24 hours for foot traffic and 48 before furniture and grills go back, longer in humid stretches. Then we walk the deck with you, touch up anything you spot, and put the workmanship warranty in writing.

Common questions

Things homeowners ask.

How long does deck stain last in Charleston?

Less than the can claims, because of our sun and humidity. On a full-sun deck, expect to recoat a semi-transparent stain in about two to three years; a covered or shaded deck usually stretches to three or four. Transparent finishes come due sooner. Solid stain holds its color longest but fails by peeling rather than fading, which is a bigger job to fix.

How long does the deck have to dry before you stain it?

At least 48 hours after the wash, and longer after a wet stretch — Lowcountry humidity slows the whole thing down. But we don't go by the clock. We take a moisture-meter reading before the first board gets stained, and if the wood isn't dry we push the day. Staining damp wood is the single most common reason a deck peels.

My deck is brand new. Can you stain it now?

Usually not right away. New pressure-treated lumber leaves the yard wet with treatment chemicals and has to dry out before it will absorb anything — that can be a few weeks or a few months depending on the batch and the weather. We test it rather than guess: sprinkle water on the boards, and if it beads instead of soaking in, the wood isn't ready. We'll come check for free.

Transparent, semi-transparent, or solid — which one?

Transparent shows the most grain and gives the least UV protection, so it needs redoing soonest. Semi-transparent is the middle ground and what we spec on most pressure-treated pine and cedar decks here: enough pigment to block sun, still reads as wood. Solid hides the grain like paint and holds color longest. Worth knowing before you choose: once a deck is solid, getting back to transparent means stripping and sanding to bare wood.

Do you repair boards and railings too?

We reset popped nails and screws as part of prep, and we'll flag rotted boards, loose railings, or failing joists at the walk-through so nothing gets stained over. Structural carpentry isn't what we self-perform — if the deck needs it, you'll hear that from us before we quote the finish, not after.

New customers · Charleston Tri-County
$500
OFF your first project

On any interior or exterior job over $3,500, for customers we haven't painted for before. Text us a photo of the room or the house and we'll put the discount on your written estimate — no coupon to print, no code to remember.

  • Free walk-through and color consult
  • Sherwin-Williams Pro line included
  • Lifetime workmanship warranty in writing
Ready when you are

Get a free deck staining
estimate this week.

Text us a photo and get a ballpark in minutes. The man who answers the phone is the one painting your house. No call centers, no subcontractors, no rotating crews.